Project Planning&Design

Planning

BSL provides total solutions and concept designs to meet customer requirements (URS) and comply with relevant standards (EU-GMP, FDA, local GMP, cGMP, WHO). After thorough review and extensive discussions with our clients, we carefully develop a detailed and complete design, selecting appropriate equipment and systems, including:

1. Process layout, clean room partitions and ceilings
2. Utilities (chillers, pumps, boilers, mains, CDA, PW, WFI, pure steam, etc.)
3. HVAC
4. Electrical System
5.BMS&EMS

D1
p6

Design

If you are satisfied with our planning service and want to do design for further understanding, we can move into design phase. We usually divide clean room project into the following 5 parts in design drawings for your better understanding. We have professional engineers to be responsible for each part.

Planning-Design2
Project Planning (1)

Construction Part

● Clean room wall and ceiling panel
● Clean room door and window
● Epoxy/PVC/High-raised floor
● Connector profile and hanger

Project Planning (1)

Utilities Part

● Chiller
● Pump
● Boiler
● CDA, PW, WFI, pure steam, etc.

Project Planning (2)

HVAC Part

● Air handling unit(AHU)
● HEPA filter and return air outlet
● Air duct
● Insulation material

Project Planning (3)

Electrical Part

● Clean room light
● Switch and socket
● Wire and cable
● Power distribution box

dsBuffer.bmp

BMS&EMS

● Air cleanliness
● Temperature and relative humidity
● Air flow
● Differential pressure
● System Running &Stop
● Audit Trail
● Running Parameter Control