DESIGN THE ROOM BOUNDARY

A coordinated enclosure.

Walls, ceilings, doors, glazing and finishes form one room boundary. Their layout follows the room use, equipment movement and cleaning access.

Before fabrication, coordinate wall supports and service openings with cleanroom flooring systems, including coved bases and door thresholds where required.

Explore planning & design↗

Doorways, windows and wall-to-floor finishes in a blue-floor cleanroom

Doorways, glazing and wall-to-floor finishes
THE CONSTRUCTION DETAILS

Where the parts meet.

Consistent drawing and fabrication details connect the enclosure components on site.

Stacked cleanroom panels showing their edge connection profiles

Panel edges and connection profiles
01

Walls

Wall lines, supports, joints and corners.

02

Ceilings

Ceiling levels, modules, supports and access.

03

Doors & glazing

Opening dimensions, frames and fixed windows.

04

Finishes

Floor junctions, corners and service passages.

SYSTEM INTERFACES

Plan the services around the room.

Ceilings, walls and openings share space with mechanical and electrical installations.

Cleanroom ceiling panels above enclosure frames during installation

Ceiling and enclosure installation
FROM FABRICATION TO SITE

Carry the detail through.

Panel edges, profiles, frames and openings need coordinated fabrication information. AILV component preparation and site installation follow the agreed drawings.

Enclosure work is sequenced with mechanical and electrical installation so service passages and finishes can be completed while keeping the required access.

Explore construction & installation↗

THE WIDER PROJECT

Connect the detail to the work.

Cleanroom Construction FAQs

What is included in a cleanroom enclosure package?

An agreed package can include wall and ceiling panels, doors, windows, profiles and related enclosure components. Confirm the item list, interfaces and installation responsibilities in the quotation.

How are cleanroom walls and ceilings coordinated with HVAC?

Room layouts, terminal positions, duct penetrations, structural supports and maintenance access should be reviewed together. The construction and mechanical teams agree opening details before fabrication and installation.

What drawings are needed before cleanroom construction?

Available room layouts, ceiling plans, door schedules, equipment locations and service interface details help define the work. Drawing revisions and site responsibilities should be agreed before release.

Can cleanroom construction be phased in an existing facility?

Phasing depends on the existing operation, access, contamination risks and the agreed construction scope. Site assessment helps determine isolation measures and necessary shutdown windows.