K-STONE ENGINEERING
Cleanroom Engineering & Turnkey Project Services
Cleanroom planning, enclosure construction and system coordination for new facilities, renovation and expansion.
01 / SELECTION & SCOPE
Start With Your Project Brief
Share your application, layout, equipment positions and working routes. For an existing facility, identify the areas to retain, change or extend and any production restrictions.
- 01Application and project location
- 02Available layout and equipment information
- 03Required environmental conditions and project programme
K-STONE Engineering coordinates cleanroom planning, systems, installation and commissioning within the agreed project scope. AILV Materials supplies cleanroom panels, doors, windows and related components.
PROJECT DELIVERY
Plan, Build & Hand Over
Follow the agreed scope from the first layout to manufacturing, site work and handover.

01 / PROJECT STAGE
Planning & Design
Establish the layout, room requirements and coordination drawings for the agreed scope.

02 / PROJECT STAGE
Manufacturing & Delivery
Release approved product information, prepare materials and organise packing and delivery against the programme.

03 / PROJECT STAGE
Construction & Installation
Coordinate enclosure installation and the agreed mechanical and electrical work at site.

04 / PROJECT STAGE
Commissioning & Handover
Define start-up, adjustment, checks and handover documents for the systems included in the project.
EXISTING FACILITIES
Cleanroom Renovation & Expansion
Upgrade existing space, add production capacity and coordinate the work around your facility.

SYSTEMS & INTERFACES
Coordinate Five Cleanroom Systems
Coordinate panel layouts and openings with air terminals, utilities, power and monitoring points. Confirm connection details and responsibilities before manufacture and installation.

04 / SELECTION & SCOPE
Compare the Same Project Scope
To compare cleanroom contractors, use the same design, supply, installation and handover requirements. List included systems, exclusions and site responsibilities. Panel supply and complete-room delivery cover different work; drawings and defined requirements support a meaningful project quotation.
- 01Design: required inputs and drawing responsibilities
- 02Supply: specified assemblies, equipment and accessories
- 03Site work: installation boundary and site conditions
- 04Handover: agreed checks and required documents
05 / SELECTION & SCOPE
Cleanroom Applications
The room layout, cleaning conditions, equipment and working routes differ by application. Start with the industry context, then review the systems and materials that apply to the project.
- 01Pharmaceutical production
- 02Electronics and semiconductor environments
- 03Food and beverage production
- 04Laboratory environments
PROJECT EXPERIENCE
Cleanroom Project References
Electronic cleanroom · Vietnam
Pharmaceutical cleanroom · Saudi Arabia
Pharmaceutical cleanroom · South Africa
Before You Request a Quotation
Can I Request One Quotation for Cleanroom Panels, HVAC and Installation?
Yes, you can ask K-STONE to prepare a combined proposal covering AILV enclosure materials, HVAC and installation within the agreed project scope. Send the room layout, project country, process equipment and required environmental conditions. Ask for separate line items for enclosure supply, HVAC equipment and controls, installation labour, air balancing and handover, with the responsible party, exclusions and acceptance criteria shown for each work package. Review cleanroom HVAC scope
What should we send with a cleanroom RFQ?
Send the application, project location, current drawing revision, room dimensions, panel and opening schedules, equipment layout, environmental requirements and target programme. Identify the materials, installation, checks and documents you want included.
Can we order materials without installation?
Yes. Request AILV enclosure materials as a separate supply package. Identify the installer, drawing responsibilities, site access, unloading arrangements and connection details so manufacturing, delivery and any K-STONE site support can be agreed.
How is cleanroom renovation or expansion scoped?
Start with the retained layout, existing panel joints, service interfaces and planned production changes. Review shutdown windows, temporary separation and installation access before agreeing replacement materials, phased work and K-STONE site responsibilities.
Discuss Your Cleanroom Project
Request a turnkey cleanroom quotation with your layout, application, project location, equipment information and target schedule. Include specified environmental conditions and, for renovation, the production restrictions and areas affected.
Home
Products
Contact